11 Comments
User's avatar
Aleksandr Dubrovin's avatar

Mark, thank you for taking the time to review my comments and for making these updates. I really appreciate your willingness to consider my perspective and clarify several important points.

Could I ask you to make the corresponding updates to the PNK Group page on Transparency Cascade as well, so that the information there is consistent with the updated article?

Aleksandr Dubrovin's avatar

This article contains a fundamental factual error: Andrey Sharkov, the founder of ShokoBox, and Andrey Sharkov, the founder of PNK Group, are two different people.

The article conflates their biographies and incorrectly attributes the ShokoBox founder’s business activities to the founder of PNK Group. This is not a minor detail — it materially affects the biographical narrative presented in the article.

I believe this should be corrected.

Mark Ramm's avatar

Can you provide information corroborating this?

Aleksandr Dubrovin's avatar

The ShokoBox founder was born in 1985 — he is a much younger businessman. You won’t find much about him in English because his business activities have been almost entirely within Russia.

Here’s his biography, including his date of birth, education and business background:

[Biography](https://24smi.org/celebrity/292559-andrei-sharkov.html)

Here are his publications:

[Articles by Andrey Sharkov](https://aif.ru/opinion/author/24673)

And here’s his podcast (also in Russian):

[“Beris i Delay” podcast](https://andreysharkov.mave.digital/)

These are all about the Andrey Sharkov who founded ShokoBox.

Mark Ramm's avatar

I have removed all referenced to ShokoBox.

Aleksandr Dubrovin's avatar

Hi Mark, thank you for correcting the ShokoBox information in your article.

I noticed that the same incorrect information is still included on the Transparency Cascade PNK Group page. Could you please update that page as well, since it refers to the same two different people? https://detention-pipeline.transparencycascade.org/organizations/pnk-group/

Thank you.

Aleksandr Dubrovin's avatar

Hi Mark,

Thank you for being open to my comments and for taking the time to review the information and make corrections. I really appreciate it.

I have one more question about the Georgia property. You note that the land was purchased for $29.4 million in 2023 and that the completed property, including a 1.2-million-square-foot distribution center, was later sold for $128.6 million. I’m not sure I understand the concern with that difference. Between those two points, the site was developed, utilities and infrastructure were installed, permits obtained, and a 1.2-million-square-foot building was constructed. Naturally, the completed property would be worth substantially more than the original land.

As for the appraisal during construction, unfortunately we cannot go back and determine exactly what the appraiser included, when the property was inspected, or how much time passed before the report was published. This matters because once the site preparation and ground work are completed, PNK’s prefabricated structural system allows buildings like this to be assembled in a matter of months. The stage of completion can therefore change very quickly.

I also wanted to ask about the description of the property as a detention center. It was developed and sold as a warehouse/distribution facility. To my knowledge, it has not been used for another purpose, and the buyer has not done any work to convert it into a detention facility. Obviously, I cannot provide proof that something did not happen, but this is something you can independently verify. Enough time has now passed to check whether the original assumption that the property would become a detention center was actually correct.

Mark Ramm's avatar

Certainly, I could add a brief statement with your explanation if you would like. The question is certainly not settled by the public record, and I certainly think some of that difference is explained by the things you mention. What I assert is that it is problematic that we do not know, not that we know that it is problematic if that makes sense.

Aleksandr Dubrovin's avatar

Mark, thank you again for taking the time to consider my comments and for making changes where you felt they were warranted. I genuinely appreciate that.

I also understand that some of the points I am raising touch on an important part of the narrative you have developed. In particular, if the property was developed and sold by PNK as a standard industrial building suitable for warehouse or manufacturing use, rather than as a detention facility, that distinction changes the context considerably.

The same applies to the appraisal issue. As we discussed, the public record does not appear to establish what stage of construction the property was in when it was appraised, exactly what the appraiser included in the valuation, or how much time passed between the inspection, appraisal and subsequent transaction. Without that information, I think it is difficult to draw a meaningful conclusion from the difference in values.

Rather than adding a separate PNK statement to the article, perhaps it would be more useful if I suggested a few specific edits to the existing language. My goal is not to replace your conclusions with a corporate statement, but to identify places where I believe the wording may imply something that the available facts do not actually establish.

If you are open to that approach, I can send you a few very specific suggested changes for your consideration.

Mark Ramm's avatar

I generally do not allow for folks covered to edit my work. But if you have suggestions, I will consider them.